Unsaturated surface drying period

Definition of Unsaturated surface drying period from the PharmacyDictionary.in

Unsaturated surface drying period

The time of a drying process between the appearance of the first surface “dry spots” and the completely dried surface. Further drying is controlled by the diffusion rate of moisture from the solid.

Not Available